FIBREOPTIC INDUSTRY ASSOCIATION - a co-host of

HOME

LINKS
FAQs

HOME
Contact the FIA

About the FIA
Join the FIA

CORPORATE MEMBERS ONLY
ASSOCIATE MEMBERS ONLY


MEMBERSHIP SEARCH ENGINE
Membership List
UK Full Members by Postcode
INSTALLERS
(Approved and General)
Alphabetic listing
Postcode listing
TRAINING PROVIDERS
Approved

FIA APPROVAL SCHEMES
Installers
Training Providers
Certified Trainers

FIA QUALIFICATION SCHEME Certified Experts

ACADEMIC QUALIFICATIONS

Advertising on this web-site

The On-Line Assistance for each risk element comprises three sections:
explanation of the risk element;
details (requirement and recommendations) of
published referenced standards;
details of changes in proposed revisions of
published referenced standards.

There are instances where not all, or none, of the sections for the risk element contain text.

The index hyperlinks below that are marked in red do not contain any text relating to the risk element.

NOTE: Where the "what the published standards say" section is blank it is because there is no applicable text. Where the "what the future standards are expected to say" section is blank it is because either there is no applicable text or that section need further work.

Is there an Installation Specification (InSpec)?
InSpec addresses other necessary building services?
InSpec addresses alarms and associated controls?
InSpec addresses atmospheric control systems?
InSpec addresses other relevant infrastructures?
InSpec details applicable legislation/regulations?
InSpec details applicable site contacts?
 
  InSpec contains Technical Specification?
Details physical and operational lifetime for cabling?
Details security mechanisms for cabling?
Details all relevant external network interfaces?
Details expansion facilities?
Details an administration system?
Details range and format of documentation required?
Details specification and application of labels?
Details acceptance testing documentation formats?
Details hazardous areas?
Details installation and operational environment
Addresses temporary abnormal environmental conditions?
Details applicable standards, codes and regulations?
Details transmission performance of the cabling?
Details cabling components?
Details methods of cabling media differentiation?
Details presentation of cable elements?
Details installation accessories and processes?
Details requirements for functional earthing?
Details EMI segregation requirements?
  InSpec contains Scope of Work?
Pre-installation
Details the work required in each pathway?
Details the responsibilities in each pathway?
Details the work required in each building entrance facility?
Details the need for preparatory surveys?

Details the mechanisms for control of materials on-site?
Installation
Details the locations of pathways and spaces?
Details site access and security arrangements?
Details warning signs and safety equipment?
Details the pathway systems to be used in each pathway?
Details the cables to be installed in each pathway? Details layouts of (en)closures in cabinets/frames/racks?
Details the jointing/termination at each termination point?
Details requirements for acceptance testing?
Details the installation programme?
Details project management responsibilities?
Post-installation
Duct sealing requirements?
Details requirements for reinstatement?

  InSpec agreed with customer?
Is change control in place for InSpec?
 
  Quality Plan agreed with customer?

Procedures to demonstrate compliance with the InSpec?
Procedures for the transfer of responsibilities?
Procedures for the acceptance of cabling components?
Procedures for the acceptance of cabling installation?
Procedures to assure component compatibility?
Procedures to assure cabling compatibility?
Procedures to address the component incompatibilities?
Procedures to avoid and/or mitigate corrosion?
Details the competency levels of installation personnel?

Confirms component fire performance/chemical resistance?
Accepts storage environments?
Accepts installation/operational environments?
For inspection/testing of cabling components or installed cabling
Details inspection and test equipment to be used?
Details test cords to be used?
Details sampling plans and test schedule?
Details test system uncertainty?
Details procedures for the treatment of marginal results?
Details the format of test results to be submitted?

  Is change control in place for Quality Plan?
Installed system power requirements advised to customer?
Is a "paper trail" audit system defined and in place?
 
SAFETY Site-specific safety requirements documented?
Induction courses planned/undertaken?
Safe working requirements notified to customer?
All practical steps taken to minimize working at height?
Segregation from mains power supply and earth cabling?
Telecommunications equipment meets IEC 60950?
Cables comply with relevant product safety requirements?
Connection interface segregation applied?
Health and Safety Plan submitted to customer?
Requirements for earthing clearly defined?
Requirements for lightning protection clearly defined?
 
ENVIRONMENTAL Components compatible with the storage environment?
Equipment compatible with the storage environment?
Components compatible with the installation environment?
Components compatible with the installation techniques? Components compatible with the operational environment?
Components meet chemical resistance criteria?
Pathway systems provide environmental protection?
Components meet fire performance criteria?
Pathway systems required to meet fire performance?
Materials selected to avoid and/or mitigate corrosion?
 
DOCUMENTATION

"Spaces" construction drawings available?
"Spaces" build schedule available?
"Spaces" labeliing schedule available?
Pathway system drawings available?
Pathway system installation schedule available?
Pathway system labelling schedule available?
Cabling drawings available?
Cable installation schedule available?
Cable labelling schedule available?
Cable element labelling/identification defined?
Termination/jointing schedule available?
Termination/joint labelling schedule available?
Earthing schedule/drawing available?

 
SURVEY

Adequate space allocated to cabling/equipment?
External network interface features confirmed?
Pathway systems have adequate capacity?
Pathway systems, cabinets/frames/racks are earthed?
Pathways are accessible?
Ducts allow sealing (if required)?
Adequate space for cable drums/installation accessories?
Adequate space for cable installation?
Adequate space for cable fleeting?
Adequate space for service loops of cable?
Adequate space for termination/splicing (en)closures?
Adequate space for cable bends?
Deviations from InSpec advised and agreed?
Component acceptance tests undertaken?
Legacy cabling acceptance tests undertaken?
Installation power requirements assessed?
Storage facilities for components/equipment assessed?

 
CUSTOMER-PROVIDED SERVICES Site-specific access systems arranged?
Induction course date(s) agreed?
Installation power requirements agreed?
Safe working areas created as per installers notification?
Storage facilities available and accessible?
Pathways and spaces available and accessible?
Site contacts confirmed?
 
SAFETY/PREPARATION Training matrix supports construction environment?
Training matrix matches Quality Plan?
Induction course completed for all operatives?
Construction areas are accessible?
Adequate space for construction tools/equipment?
Confined space access equipment in place?
Gas testing at chambers completed?
Excavations signed and guarded?
Construction site area barriers installed?
Utility drawings available?
Utility plant marked on surface?
Utility drawings checked for location of buried services?
Ground CAT scanned to locate unmarked services?
Safe dig techniques employed?
 
DUCTS/CHAMBERS

Grassed areas protected from works?
Ducts correctly installed?
Duct entry into chambers meets specification?
Chambers installed to specification?
Brackets and bearers installed as required?
Frames and covers flush with surface?
Ducts tested?
New ducts roped?
Building lead-in duct temporarily sealed/plugged?

 
REINSTATEMENT Chamber floors free of debris?
Sump cover removed from sump before chambers closed?
Chamber covers seated correctly?
Chamber key holes not worn?
Chamber frames secured?
Backfill and re-instatement to HAUC standard?
Work areas clean and tidy?
All signs and guards removed?
All spillages cleaned up?
Landscaped areas restored?
Site-specific access systems returned to customer?
 
Training matrix supports installation environment?
Training matrix matches Quality Plan?
Induction course completed for all operatives?
Confined space access equipment in place?
Working at height equipment, signage and guards in place?
Gas testing at chambers carried out?
IEC 60825-2 hazard classification defined?
 
Pathway systems
Pathway systems correctly installed?
Pathway systems accommodate cable minimum bend radii?
Pathway systemslabelled as required as per schedule?
Pathway systems earthed as per InSpec?
Pathway systems enable access for cable dessing i.e. ties?
Cable installation (general)
Cable minimum bend radius observed?
Cable maximum tensile load not exceeded?
Cable service loops installed as required?
Spare capacity maintained in pathways systems?
Cables laid neatly on trays and in trunking?
Cables tied to trays?
Cable ties cut with correct tool and with no sharp edges?
Cables not compressed by cable ties?
Cables labelled as per schedule?
Cable installation (external)
Anti-creepage used where necessary?
Fused swivel used?
Cable guides and “bell mouths” used?
Lower ducts used first in chambers?
Cables supported in chambers?
Cables not inter-twined through chambers?
Cables not lying on floor of chambers?
Standing room maintained in chambers?
No excess cable in chambers?
No ropes in ducts containing cables?
Building entry ducts sealed?
Conductive cable structural members earthed as per InSpec?
 
Cabinets, frames and racks
Located, configured and labelled as per schedule?
Earthed as per InSpec?
Cables dressed into cabinet/frame or rack?
Cords dressed neatly and free from stress?
Cords contained within management fixtures?
Cords labelled as per schedule?
(En)closures
Located, fixed and labelled as per schedule?
Installed to allow basic rework?
Installed to allow live system rework?
Cables colleted/glanded as per schedule?
Cable strength members secured to anchoring posts?
Cable elements colleted/marked as per schedule?
Adequate excess length on cable elements?
Termination/joints undertaken correctly?
Ports labelled and sealed/capped?
(En)closures (optical fibre-specific)
Primary coated optical fibres sleeved?
Optical fibre splice protectors supported?
Optical fibre/pigtails managed in splice trays or equivalent?
Connectors cleaned by recommended methods?
Optical fibre shards safely contained and removed?
Optical fibre shards disposed of safely?
Ports labelled and sealed/capped?
(En)closures (blown optical fibre-specific)
Optical fibre tubes dressed and secured through unit?
Optical fibre tubes secured at trays?
 

Inspection methods in accordance with Quality Plan?
Test methods in accordance with Quality Plan?
Inspection schedule in accordance with Quality Plan?
Test schedule in accordance with Quality Plan?
Inspection and test equipment “in calibration”?
Test cords labelled/identified and recorded?
Test equipment limits correctly applied?
Test equipment settings recorded?
Test configurations recorded?
Inspection records in accordance with InSpec?
Test records in accordance with InSpec?
Marginal results treated in accordance with Quality Plan?

 
Cable drums/reels/packaging removed from site?
Tools and construction equipment inventory checked?
Work areas clean and tidy?
Cabinet doors fitted, locked and keys submitted?
Trunking lids secure?
Site-specific access systems returned to customer?
 
Final Installation Specification submitted?
Installation Specification audit trail submitted?
Final Quality Plan submitted?
Quality Plan audit trail submitted?
As-built drawings submitted?
Final cabling documentation submitted?

Test and inspection results submitted?
Installation operating instructions submitted?
Sign-off paperwork submitted?
Non-compliance paperwork submitted?
 
Induction course(s) completed?
Construction site area barriers installed?
Confined space access equipment in place?
Working at height equipment, signage and guards in place?
Gas testing at chambers carried out?
IEC 60825-2 hazard classification applied?
Site-specific safety requirements complied with?
 

Pathway and pathway systems
Pathway systems correctly installed?
Pathway systems earthed as per InSpec?
New ducts roped?
No ropes in ducts containing cables?
Labelling as per schedules?
Chambers
Chambers installed to specification?
Chambers fitted out correctly?
Building entrances
Building entry ducts sealed?
Cabinets, frames and racks
Located as per schedule?
Earthed as per InSpec?
Completion
Backfill and re-instatement to HAUC standard?
Work areas clean and tidy?
All signs and guards removed?
All spillages cleaned up?
Landscaped areas restored?
Site-specific access systems returned to customer?

 

Cable Installation (General)
Spare capacity maintained in pathways systems?
Cable minimum bend radius observed?
Cable service loops installed as required?
Cables laid neatly on trays and in trunking?
Cables tied to trays?
Cable ties cut with correct tool and with no sharp edges?
Cables not compressed by cable ties?
Cables colleted/glanded/labelled as per schedule?
Conductive cable structural members earthed as per InSpec?
Cabinets, frames and racks
Configured and labelled as per schedule?
Cables dressed into cabinet/frame or rack?
Cords dressed neatly and free from stress?
Cords contained within management fixtures?
Cords labelled as per schedule?
Cabinet doors fitted, locked and keys submitted?
Chambers
Cables managed and dressed correctly in chambers?
(En)closures
(En)closure labelled, fixed and located as per schedule?
(En)closure ports labelled and sealed/capped?
(En)closures (Optical fIbre-specific)
Primary coated optical fibres sleeved?
Optical fibre splice protectors supported?
Optical fibre/pigtails managed in splice trays or equivalent?
Optical fibre shards disposed of safely?
Completion
Work areas clean and tidy?
All signs and guards removed?
All spillages cleaned up?
Site-specific access systems returned to customer?

 

Inspection methods in accordance with current Quality Plan?
Test methods in accordance with current Quality Plan?
Inspection and test equipment “in calibration”?
Test cords labelled/identified and recorded?
Balanced cabling test cords of correct design?
Optical fibre test cords of correct design?
Test cords stored with care?
Test cords within "lifetime" and in good condition?
Test cords used without undue bends/kinks?
Live systems not jeopardised by testing process?
Test system reference correctly applied?
IEC 60825-2 hazard classification applied during testing?
Optical fibre connectors cleaned before testing?
Test equipment limits correctly applied?
Test equipment settings recorded?
Test configurations recorded?
Inspection records in accordance with Quality Plan?
Test records in accordance with Quality Plan?
Marginal results treated in accordance with Quality Plan?

 

Final Installation Specification received?
Installation Specification audit trail received?
Final Quality Plan received?
Quality Plan audit trail received?
Health and Safety Plan received?
Safe working requirements received?
Duct test results received?
Installed system power requirements received?
As-built drawings received?
Final cabling documentation received?

Installation operating instructions received?
Sign-off paperwork received?

Cabling test and inspection results received?
Cabling test and inspection results in correct format?
Non-compliance paperwork received?